What are data centers?
Data centers are warehouse-like buildings full of computer servers. They are the physical machines behind cloud storage, streaming, online banking, video calls, and artificial intelligence (AI). Every email you send or website you load runs through one. They range from small server rooms to enormous “hyperscale” campuses covering hundreds of thousands of square feet. The United States hosts the most in the world — estimates range from about 4,000 to 5,400 facilities depending on how they are counted. These facilities are concentrated heavily in Virginia, Texas, and California.
You can learn more at: National League of Cities Understanding Data Centers
What are the different types of data centers?
There are three main types. Enterprise data centers are owned and used by a single company for its own operations. Colocation facilities rent out space and compute power to multiple tenants who install their own servers. Hyperscale data centers are the giant, multi-building campuses run by companies like Amazon, Google, Microsoft, and Meta. Hyperscale and colocation facilities together now account for the large majority of data center resource use.
You can learn more at: National League of Cities Understanding Data Centers
How do data centers use water?
Data centers use water in two ways. Directly, on-site, water carries heat away from the servers, which is then often evaporated in cooling towers. Indirectly, water is consumed off-site at the power plants that generate the facility’s electricity. The indirect share is usually the larger of the two. Not all water taken in is “used up”: the portion that evaporates is consumed, while the rest is often returned to the local system.
You can learn more at: EESI Data Centers and Water Consumption
How much water do data centers use?
In 2023, U.S. data centers directly consumed about 17.4 billion gallons of water — comparable to roughly 160,000 U.S. households. That is roughly the amount of water used to irrigate 71,000 acres of corn in the state of Nebraska. It is a small fraction of total national water use. At the facility level, a large water-cooled site may withdraw anywhere from under 500,000 gallons per day (about 1,600 households) to more than 2 million gallons per day. The largest facility with well-documented numbers from Google consumed about 2.8 million gallons a day. That’s roughly four Olympic pools or the daily indoor water use of a town of 25,000 each day.
Data center water use exhibits a strong seasonal pattern, with daily consumption typically peaking in the summer. At some data centers, water is used for only about 10% of the year, resulting in peak daily water demand that can be 5-10 times the annual daily average. Similar to power grids, local community water systems must have sufficient capacity to accommodate these peak demands to ensure reliable service.
The indirect water embedded in data center electricity generation is far larger, around 211 billion gallons.
You can learn more at: MOST Policy Initiative: Data Center Water Use
Are data centers draining local water supplies?
It depends almost entirely on location, which is why national numbers can mislead. Nationally, direct data-center water use is a small share of the U.S. total. But one large evaporatively cooled facility can withdraw millions of gallons a day, placing stress on a small or already-strained watershed. The right question is not whether data centers use “a lot” of water, but how much a particular facility will withdraw (and what percent is consumed) from your local source. Generally, the more water-stressed a region, the more care and consideration will need to be taken.
You can learn more at: AWWA Cooling the Cloud — Water Utilities in a Data-Driven World
How do data centers use energy?
Almost all of a data center’s electricity goes to two things: running the servers themselves, and cooling them. Servers run 24 hours a day, every day, and generate enormous heat that must be continuously removed. This is why data centers are considered “industrial-scale” electricity users; they run around the clock with power demand potentially rivaling a small city. Cooling usually accounts for less than half of total power use (30-40%). While some newer data centers have relatively low annual cooling energy consumption, their cooling demand can rise significantly during the summer, when the power grid is often under greater stress. Reducing the energy used for cooling does not often significantly reduce a data center’s overall energy consumption.
You can learn more at: LBNL 2024 U.S. Data Center Energy Usage Report
How much energy do data centers use?
In 2023, U.S. data centers used about 176 terawatt-hours of electricity — roughly 4.4% of the national total, up from just 1.9% in 2018. To put that in perspective, 176 TWh is about the annual electricity use of 16 million U.S. homes. At the facility level, a single large data center draws 100 to 500 MW. For context, 100 MW can power roughly 70,000 homes. Projects suggest that data centers’ national share of energy could reach 6.7% to 12% by 2028, though that range is wide because it depends on how fast AI hardware grows.
You can learn more at: LBNL 2024 U.S. Data Center Energy Usage Report
Do data centers strain the electricity grid?
Data centers are unlikely to cause a national electricity shortage. However, individual facilities can overwhelm local grids that were never designed for a single customer adding hundreds of megawatts of demand. In regions with extensive new data center development, waits to connect new facilities to the grid can exceed five years. Essentially, there is a disconnect between existing infrastructure and new demand, not necessarily a lack of supply. This mismatch is pushing some operators to build their own on-site power (“behind-the-meter”) to avoid the queue. This can sidestep grid concerns, but it can also raise new questions about a parallel, privatized, and largely unregulated energy generation system.
You can learn more at: Belfer Center AI, Data Centers, and the U.S. Electric Grid
Will data centers raise my electricity bill?
It depends on where you live, and the evidence genuinely conflicts. Some regions with capacity markets, such as the Central U.S. and Mid-Atlantic region, have seen record-high wholesale prices driven partly by data-center demand. But at the national scale, analyses suggest that data centers were not a major driver of retail price increases from 2019 to 2025. Some states with the most data center growth often saw prices hold steady or even fall — likely because the added demand spread fixed costs across more sales. Widely shared claims that data centers doubled electricity prices are unsupported, though that does not mean these concerns are unimportant.
If you are worried about a data center’s impact on your bills, ask your utility how it structures pricing and contact local officials to see whether they are creating guardrails to prevent cost-shifting.
You can learn more at: CRS Data Centers and Their Energy Consumption (FAQ)
How are data centers cooled, and why does it matter?
Cooling is the single biggest design choice affecting a facility’s water and energy use. Generally, water and electricity trade off. Evaporative (water-cooled) systems save the most electricity but consume the most water. Air-cooled (dry) systems use almost no water but more electricity — which raises indirect water use and emissions elsewhere. While air cooling is generally sufficient to dissipate heat during colder months, the water-energy tradeoff becomes most pronounced in the summer, when heat rejection is most challenging.
Newer closed-loop and liquid cooling designs, increasingly common for dense AI hardware, can enable more hours of “free” heat rejection without evaporative or refrigeration assistance, thereby improving the water-energy tradeoff. However, closed-loop cooling primarily transfers heat from the servers to the facility cooling system and does not necessarily eliminate water use for final heat rejection. A closed-loop system paired with evaporative heat rejection can still consume significant amounts of water.
Essentially, no option is free. Every choice shifts the burden between water and energy.
You can learn more at: EPA Clean Air Act Resources for Data Centers
Should I be worried about data centers?
Two things can be true at once. Nationally, data center water and energy use still make up a modest share of U.S. totals, and a single large facility can matter a great deal to a specific local grid or watershed. The impacts are overwhelmingly local, which is exactly the scale at which they can be measured and managed. A healthy approach is skepticism toward both worst-case viral figures and reassuring corporate totals. Focus on the specific numbers for the specific project near you.
You can learn more at: CRS Data Centers and Their Energy Consumption (FAQ)
What questions should my community ask about a proposed data center?
A practical checklist: What is the cooling technology? What is the water source — potable or reclaimed? How much water and power will it withdraw and consume? Will it connect to the grid or generate its own power? Who pays for new lines and plants? What happens to the wastewater discharge? Ready-made question checklists exist for this purpose, and asking for local numbers is key to a meaningful answer.